Map pin830-848 San Pablo Avenue, Pinole, CA 94564

Pinole Shores Phase II

Pinole Shores Phase II_販売物件

特性

土地面積グロス
2.99 ha
用途地域
Office Industrial Mix Use (OIMU) - (Proposed)

形容

Jones Lang LaSalle America’s Inc., (“JLL”), as exclusive advisor, is pleased to present the opportunity to acquire the fee-simple interest of Pinole Shores, an existing 7.39 acre land site (the “Site”). The Site, located in the City of Pinole, an East Bay submarket, is an unimproved infill parcel and offers a rare chance to develop a brand new ±118,000 SF Class A industrial property with modern specs. The Site is fully entitled and provides regional connectivity to the Port of Oakland, the Port of Richmond, Oakland International Airport, San Francisco International Airport, and the broader Bay Area via major highways I-80, I-580, and CA-4.


The Site, currently zoned Office Industrial Mix Use (OIMU), offers a range of uses, including light industrial services such as light manufacturing, R&D, wholesale/distribution, storage facilities & development.


The San Francisco Bay Area is seeing robust tenant demand for industrial buildings to the magnitude of 16.3M SF of tenant leasing requirements, over 10.4M of which is exclusively focused on the East Bay. This demand is largely comprised of users in Manufacturing, Automobiles, Logistics & Distribution, Food/Beverage and Healthcare. As the demand for industrial properties continues to rise, this one-of-a-kind infill investment opportunity offers investors the chance to secure a unique and highly desirable Site in one of the most sought-after industrial pockets across the country.

...

投資のハイライト

  1. Rare Fully-Entitled Class A Development Opportunity
  2. The Site is fully-entitled on ±321,780 square feet of land (±7.39 acres), with access on San Pablo Avenue.
  3. Given the infrequent cadence at which land sites become available to developers and the lengthy construction timelines, the average building age in the Bay Area continues to climb. Given the imbalance between tenant demand and lack of new supply, this new development will garner significant tenant interest.
  4. Strategic Infill Core Bay Area Location Positioned for West Coast Distribution
  5. The Site is located less than three miles from I-80, I-580, and CA-4, providing access to greater Northern California. The Site is a short 30-45 minute drive from the Oakland International Airport, and less than 20 miles from the Port of Oakland and BNSF Oakland Intermodal.
  6. Within a 15-mile drive from the Site, tenants can reach 1.2 million people or 480K households. Moreover, the Site offers easy connectivity to over 30,000 establishments, providing last-mile capabilities to both affluent consumers and local businesses.
  7. Ample and Affordable Industrial Work Force
  8. The Pinole/Richmond area offers a relatively lower cost of living compared to other cities in the East Bay. More than 20% of surrounding residents work in manufacturing, transportation, or warehousing allowing tenants at the Property to attract employees at affordable wages.
  9. Demand Increasing for Infill Industrial Space
  10. Consumers continuously expect shorter delivery windows, adding pressure for companies to lower delivery time via more distribution space near their customers.
  11. High Barriers to Entry
  12. The East Bay is one of the most difficult development markets in the US. Due to CEQA, land constraints, and entitlement headwinds, which drive up development costs, there is little risk for oversupply in Northern California as supply moves in lock-step with demand. As of June 2024, the speculative development pipeline is 1% of the total inventory (JLL Research).
Pinole Shores Phase II 4_販売物件
Pinole Shores Phase II 4_販売物件
Pinole Shores Phase II (0 物件)

担当者に連絡する

ご不明点がございましたらFAQページをご覧ください。
FAQページを見るArrow Right
資金調達とポートフォリオ管理はJLLにお任せください。お客様の投資達成に向けたご提案を差し上げます。メールにてお問い合わせください。
最終更新
2025年9月25日